| Date | Hour Meter | Service Performed (Oil / Filter / Grease / Repair) | Next Due Hours | Operator / Tech |
|---|---|---|---|---|
| [ ] Break-in 50h [ ] Oil [ ] Filters [ ] Grease | ||||
| [ ] Oil [ ] Air/Fuel Filter [ ] Hydraulic [ ] Grease | ||||
| [ ] Oil [ ] Air/Fuel Filter [ ] Hydraulic [ ] Grease | ||||
| [ ] Oil [ ] Air/Fuel Filter [ ] Hydraulic [ ] Grease | ||||
| [ ] Oil [ ] Air/Fuel Filter [ ] Hydraulic [ ] Grease | ||||
| [ ] Oil [ ] Air/Fuel Filter [ ] Hydraulic [ ] Grease |
| Date | Machine | Hrs/Mi | Job / Note | Logged by |
|---|---|---|---|---|
| Mon | JD Backhoe EX | +8.5h | Foundation dig — Riverside Commercial | T. Miller |
| Mon | Bobcat S300 SK | +6.0h | Grading — Oak Hill project | R. Sanchez |
| Tue | JD Backhoe EX | +7.0h | Utility trench — Maple Ave | T. Miller |
| Tue | CAT 305E2 ME | +8.0h | Pond excavation — County Rd 12 | D. Okafor |
| Wed | JD Backhoe EX | +6.5h | Backfill — Riverside Commercial | T. Miller |
| Wed | Bobcat S300 SK | +5.5h | Driveway base — Pine St | R. Sanchez |
| Thu | JD Backhoe DOWN | 0h | Grease seal replacement — shop | T. Miller |
| Thu | CAT 305E2 ME | +9.0h | Pond completion — County Rd 12 | D. Okafor |
| Thu | 2019 F-350 TR | +95mi | Haul runs — 4 loads, site C | J. Wilson |
| Fri | JD Backhoe EX | +8.0h | Resumed — site C | T. Miller |
| Fri | Bobcat S300 SK | +7.0h | Final grade — Oak Hill | R. Sanchez |